Estimated:
Actual: 2200
Notes: The contractor's estimate includes this cost in the "finished basement" cost. We have to get this broken down further.
UPDATE: We paid a local contractor (same guy who did the set) to run our (pretty simple) rough plumbing in the basement. Brought the water line across the basement over to the bathroom and out to an exterior hose bib, did the supply and waste lines for the bath, shower, sink, toilet and washing machine. All pex lines. Includes all the brass ball valves.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment